Restricted Hours Noise Monitoring Results -- Evening time 
Station M3, Kwan Yick building
Date Start Time End Time  Weather Noise level (dB(A)), 5 min Major Construction Noise Source(s) Observed Other Noise Source(s) Observed Remarks Temp. (°C) Wind Speed (m/s) Noise Meter Model / ID Calibrator Model / ID
Leq L10 L90
05-Jun-12 20:01 20:16 Fine 66 67 64 No outdoor construction noise Mainly traffic noise - 28.0 0.5 RION- NL31 (S/N 00603867) RION - NC73 (S/N 10997142)
19-Jun-12 19:32 19:47 Fine 66 68 65 No outdoor construction noise Mainly traffic noise - 28.0 0.5 RION- NL31 (S/N 00603867) RION - NC73 (S/N 10997142)
27-Jun-12 22:45 23:00 Fine 66 68 64 No outdoor construction noise Mainly traffic noise - 29.4 0.5 B&K 2238   S/N: 2385180 B&K 4231   S/N: 2656516
Min. 66
Max. 66 [1] The data (M3_Evening Time) of 5 and 19 June were provided by Contract No. DC/2007/23. Calibration certificates for the noise meter(s) and calibrator(s) used were included in the corresponding Monthly EM&A Report for this Contract
Station M5a, Chuk Lam Ming Tong
Date Start Time End Time  Weather Noise level (dB(A)), 5 min Major Construction Noise Source(s) Observed Other Noise Source(s) Observed Remarks Temp. (°C) Wind Speed (m/s) Noise Meter Model / ID Calibrator Model / ID
Leq L10 L90
06-Jun-12 22:45 23:00 Fine 58 59 49 Works in tunnel Road traffic at San Wan Drive  According to contractor, general construction works was in process accordance to CNP. 28.3 <5 B&K 2238   S/N : 2684502 B&K 4231  S/N: 2656516
19-Jun-12 22:45 23:00 Cloudy 60 59 49 Works in tunnel Road traffic at San Wan Drive  According to contractor, general construction works was in process accordance to CNP. 28.2 <5 B&K 2238   S/N : 2385180 B&K 4231  S/N: 2656516
Min. 58
Max. 60
Station M6a, Aegean Terrace
Date Start Time End Time  Weather Noise level (dB(A)), 5 min Major Construction Noise Source(s) Observed Other Noise Source(s) Observed Remarks Temp. (°C) Wind Speed (m/s) Noise Meter Model / ID Calibrator Model / ID
Leq L10 L90
14-Jun-12 22:45 23:00 Fine 60 61 56 Works inside tunnel Local traffics of Aegean Terence According to contractor, general construction works was in process accordance to CNP.
Free-field measurement, +3dB correction.
27.4 <5 B&K 2238   S/N : 2385180 B&K 4231      S/N: 2656516
Min. 60
Max. 60